Duration |
Owner |
Description |
Service |
| |
National Starch & Chemical (Thailand)Limited. |
|
|
| 1999 |
Site location 1: Karasin Province (Main plant) |
1.Motor Control Center (MCC) |
EE&AUTOMATION |
| 2002 |
Site Location 2: Rayong Province |
2.Local Starter Panel Up to 200 kW |
EE |
| 2005 |
Site Location 3: Minburi Bangkok |
3.Low Voltage Main Distribution Panel Up to 4000A |
EE |
| |
|
4.PLC & DCS System Control Panel |
AUTOMATION |
| 2002 |
Metropolitan Water Works Authority. (MWA) |
|
|
| |
Site location : Bangkok (Samsan) |
1.PLC Remote control system |
AUTOMATION |
| |
|
2.Medium Voltage Switchgear 3300V |
EE |
| |
|
3.Automatic BackWash control system |
EE |
| |
|
with MMI Software |
AUTOMATION |
| 2002 |
Department of Energy Development & Promotion (DEDP) |
|
|
| |
Site location: Bangkok |
1.Low Voltage Starter Panel up to 315 kW |
EE |
| |
|
2. Water Level Monitoring system |
AUTOMATION |
| 2000 |
DKK Sino-Thai Construction Co.,Ltd. |
|
|
| |
Site location : Pratumtane Province |
1.Tower Light Control Panel & Alarm system |
EE |
| 2001 |
Pattaya Wastewater Treatment Plant |
|
|
| |
Main Contactor : Summit Grade Ltd.,Part. |
1. Motor Control Center (MCC) |
EE |
| |
Sub Contactor : FE Zuellic Industrial Co.,Ltd. |
2.Local Starter Panel |
EE |
| |
Site location : Pattaya Chonburi Province |
3. VFD Control panel up to 300HP. |
EE&AUTOMATION |
| 2001 |
Rajburana Wastewater Treatment Plant |
|
|
| |
Main Contactor : Nuwarat Pattanakarn Co.,Ltd. |
1. Motor Control Center |
EE |
| |
Sub Contactor : FE Zuellig Industrial Co.,Ltd. |
2.Local Starter Panel |
EE |
| |
Site location : Bangkok (Rajburana) |
3. VFD Control panel up to 300HP. |
EE&AUTOMATION |
| 2000 |
Asia Flutous Co.,Ltd. |
|
|
| |
Site location : Karnjanaburi Province |
1,Main Distribution Board (Up to 4000 kVA) |
EE |
| |
|
2.Local Motor Control Center |
EE |
| 2001 |
Pattanayon Chonburi Co.,Ltd. |
|
|
| |
Poject: MPA |
Automatic Generator set control systems |
AUTOMATION |
| |
Site location : Lampang Province |
|
|
| 2001 |
Samut Prakarn Wastewater Management Project. |
|
|
| |
Main Contactor : Alstom Contracting (Thailand) Ltd. |
Low Voltage Motor Control Center |
EE |
| |
Sub Contactor: F.E Zuellig Industrial Co.,Ltd. |
|
|
| |
Site location: Samut Prakarn Province |
|
|
| 2002 |
General Motors (Thailand) Limited. |
|
|
| |
Site location : Rayong Province |
Main Distribution Panel |
EE |
| 2002 |
Procter & Gamble Manufacturing(Thailand)Limited. |
|
|
| |
Site location : Wellgrow Industrial Estate ,Bangna-Trad |
PLC Panel |
AUTOMATION |
| |
Main contactor: Rockwell Automation Thai Ltd. |
|
|
| 2002 |
MTU Asia (Thailand)Ltd. |
|
|
| |
Main contactor: F,E Zuellig Industrial Co.,Ltd. |
Generator set Control Panel |
AUTOMATION |
| 2002 |
UNOCAL Thailand,Ltd. |
|
|
| |
Main contactor: Rockwell Automation Thai Ltd. |
Motor Control Center |
EE |
| 2002 |
Charoen Pokphand Engineering Co.,Ltd. |
|
|
| |
Main contactor: Rockwell Automation Thai Ltd. |
Motor Control Center & PLC Panel |
EE&AUTOMATION |
| 2002 |
Toshiba Asia Pacific PTE., Ltd. |
|
|
| |
|
: Low Voltage AC Drive Control Panel |
EE |
| 2002 |
Government Pharmaceutical Organization |
|
|
| |
Site Location: Head Office |
Out Door Main Distribution Panel (1500kVA) |
EE |
| 2002 |
Thai Airways International Public Co.,Ltd. |
|
|
| |
Site Location: Donmuang |
Main Distribution Board |
EE |
| 2002 |
MTU ASIA(THAILAND)LTD. |
|
|
| |
Site Location : BANYAN TREE PUKET ISLAND (Phuket) |
Control Panel & Automatic Transfer Switch |
EE |
| 2003 |
Diesel Engineering Co.,Ltd. |
|
|
| |
Site Location : PP ISLAND CABANA HOTEL (Krabi) |
Generator 937.5 kVA & 630 kVA |
EE&AUTOMATION |
| |
Site Location : T.U.W TEXTILE CO.,LTD. (Nakorn Pathom) |
Control Panel & Synchronizing System |
|
| |
|
Generator 937.5kVA |
|
| |
|
Control Panel & Automatic Transfer Switch |
|
| 2004 |
SAHAVIRIYA STEEL INDUSRIES PUBLIC CO.,LTD. |
|
|
| |
Site Location :Bang Saphan Prachuapkereekan |
MCC PANEL 250KW. |
EE |
| 2004 |
STARMICRO TECHNOLOGY CO.,LTD. |
|
|
| |
Main contactor: Cheamitreat Thailand Co.,Ltd. |
MCC PANEL RO UNIT |
EE&AUTOMATION |
| 2004 |
WESTERN DIGITAL CO.,LTD. |
|
|
| |
Main contactor: Cheamitreat Thailand Co.,Ltd. |
MCC PANEL RO UNIT |
EE&AUTOMATION |
| |
Site Location : Pathumthani |
|
|
| 2004 |
SII CO.,LTD |
|
|
| |
Main contactor: Cheamitreat Thailand Co.,Ltd. |
MCC PANEL RO UNIT |
EE&AUTOMATION |
| |
Site Location : Ayudthaya |
|
|
| 2004 |
HILLSIDE HOTEL |
|
|
| |
Main contactor: Kate Thailand Co.,Ltd. |
MDB 3200A& CONTROLL PANEL |
EE |
| |
Site Location : Changmai |
|
|
| 2005 |
TPE CO.,LTD. |
|
|
| |
Main contactor: NALCO Co.,Ltd. |
MCC VFD & INSTALLATION |
EE&AUTOMATION |
| |
Site Location : Rayong |
|
|
| 2005 |
SAHAVIRIYA STEEL INDUSRIES PUBLIC CO.,LTD. |
|
|
| |
Owner :SSI |
|
|
| |
Site Location :Bang Saphan Prachuapkereekan |
MCC PANEL 250KW. |
EE&AUTOMATION |
| 2005 |
TNP(Thai National power) |
|
|
| |
Main Contactor : NALCO CHEMICAL CO.,LTD. |
Water Treatment-37kW.X 2Plant |
EE&AUTOMATION |
| |
Site Location :Chonburi |
|
|
| 2005 |
Gold Press Industry Co.,Ltd. |
|
|
| |
Main contactor :KSB Treatment Group Co.,Ltd. |
RO UNIT Cap8.0cu.m./hr. |
EE&AUTOMATION |
| |
Site Location :Nakornnayok |
|
|
| 2005 |
Chumporn Palm Oil Industry Public Co.,Ltd |
|
|
| |
Main contactor :KSB Treatment Group Co.,Ltd. |
RO UNIT Cap40.0cu.m./hr. |
EE&AUTOMATION |
| |
Site Location :Chumporn |
|
|
| 2005 |
Rice mill Teal Lee Hong |
|
|
| |
Owner :Teal Lee Hong |
MCC PANEL 25kW.X 60Units |
EE&AUTOMATION |
| |
Site Location :Chachoengsao |
|
|
| |
|
|
|
| |
|
|
|
| 2007 |
AJINOMOTO SALES (THAILAND) CO.,LTD |
|
|
| |
Main contactor: OGRANO (THAILAND) CO.,LTD. |
Water Treatment-37kW. |
EE&AUTOMATION |
| |
Site Location : Saraburi |
|
INSTALLATION |
| |
|
|
|
| 2007 |
Padang Industry Co.,Ltd |
|
|
| |
Main contactor: First Fame Systems Co.,Ltd |
Inverter Drive 37kW 660VAC |
EE&INSTALLATION |
| |
Site Location : Tak |
|
|
| |
|
|
|
| 2007 |
Wastern Digital Co.,Ltd |
|
|
| |
Main contactor: Chemitreat (Thailand) Co.,Ltd |
Water Treatment Plant |
EE&AUTOMATION |
| |
Site Location : Hitech Ayudthaya |
|
INSTALLATION |
| |
|
|
|
| 2007 |
Eester Palm Oil Co.,Ltd |
Water Treatment Plant |
EE&AUTOMATION |
| |
Main contactor: Chemitreat (Thailand) Co.,Ltd |
RO UNIT Cap40.0cu.m./hr. |
INSTALLATION |
| |
Site Location : Chonburi |
|
|
| |
|
|
|
| 2007 |
Airports of Thailand Public Company limited (AOT) |
|
|
| |
Main Contactor : Festo (Thailand) Co.,Ltd |
MDB Panel Main 3200A 2 Unit |
EE&INSTALLATION |
| |
Site Location : Suvarnabhumi Airport |
MDB Panel Main 250A 4 Unit |
|
| |
|
|
|
| 2007 |
SFCC - SARABURI |
|
|
| |
Main Contactor : Nalco Industrial Sevice (Thailand) Co.,Ltd |
POLYMER FLUCCULANT FEED SYSTEM |
EE&AUTOMATION |
| |
Site Location : Saraburi |
|
INSTALLATION |
| |
|
|
|
| 2007 |
BAYER METERIAL SCIENCE |
|
|
| |
Owner : BAYER METERIAL SCIENCE |
PCUS 210 220VAC DISTRIBUTION CABINET |
EE&INSTALLATION |
| |
Site Location : Rayong |
|
|
| |
|
|
|
| 2007 |
TASA INDUSTIAL CO.,Ltd |
|
|
| |
Main contactor : Globaltronic Intertrade Co., Ltd.(GTI) |
12 M Street Ligting Pole With 1.5 M Single AMR |
JUCTION BOX |
| |
Site Location : Sumutsakhon |
|
TERMINAL |
| |
|
|
|
| 2007 |
ASIA PET (Thailand) Co.,Ltd |
|
|
| |
Main contactor : Chemitreat (Thailand) Co.,Ltd |
Water Treatment Plant |
EE&AUTOMATION |
| |
Site Location : Lopburi |
|
INSTALLATION |
| |
|
|
|
| 2007 |
UNION AUTOPART MUNUFACTURING |
|
|
| |
Main contactor :KSB Treatment Group Co.,Ltd. |
DI Recycle Plant |
EE&INSTALLATION |
| |
Site Location : Chonburi |
|
|
| |
|
|
|
| |
|
|
|
| 2007 |
Metropolitan Water Works Authority. (MWA) |
|
|
| |
Owner : (MWA) |
Starter Air Compressure |
EE&INSTALLATION |
| |
Site Location : Bangkok (Samsen) |
|
|
| |
|
|
|
| 2007 |
BAYER METERIAL SCIENCE |
|
|
| |
Main contactor : Energitic Ltd.,Part |
DCS-Marshalling & Auxiliary |
Design & Wiring |
| |
Site Location : Rayong |
|
INSTALLATION |
| |
|
|
|
| 2008 |
SIME LCP POWER Co.,Ltd |
|
|
| |
Main contactor : Nalco Pacific Pte Co.,Ltd |
SLP 60 MW CCGT POWER |
EE&AUTOMATION |
| |
Site Location : Rayong |
Plant Expansion Project |
INSTALLATION |
| |
|
|
|
| 2008 |
Microfiber Industries Limited |
|
|
| |
Main contactor : Puritek Engineering Co.,Ltd |
Modify Suction Line Of Fiberizing |
EE&INSTALLATION |
| |
Site Location : Bangkok |
MCC Variable Frequency Drive 160kW |
|
| |
|
|
|
| 2008 |
Metropolitan Water Works Authority. (MWA) |
|
|
| |
Owner : (MWA) |
Raw Water Pump Motor Auto Transformer Starter 6 Unit |
EE&INSTALLATION |
| |
Site Location : Bangkok (Samsan) |
|
|
| |
|
|
|
| 2008 |
JPIPAT Co.,Ltd |
|
|
| |
Main contactor : WATHAM CO.,LTD |
MDB Stater Vaccum Contactor 3.3.KV. 400A 6 Unit |
EE&INSTALLATION |
| |
Site Location : Rangsit Pathumthani |
|
|
| |
|
|
|
| 2008 |
PTT Public Company Limited |
|
|
| |
Main contactor : Rock Well Automation Thai Co., Ltd |
Gas Turbo Expander Compressor |
Design & Wiring |
| |
Sub contactor : Expert Automation Co., Ltd |
(DCS-Marshalling & Auxiliary) |
|
| |
Site Location : Rayong |
|
|
| |
|
|
|
| 2008 |
EIDENSHA (Thailand) Co.,Ltd |
|
|
| |
Main contactor : EIDENSHA (Thailand) Co.,Ltd |
PLC " Allen-Bradley " |
Supply Spare Part |
| |
Site Location : Rayong |
|
|
| |
|
|
|
| |
|
|
|
| 2009 |
BAYER METERIAL SCIENCE |
|
|
| |
Main contactor : Energitic Ltd.,Part |
DCS-Marshalling & Auxiliary |
Design & Wiring |
| |
Site Location : Rayong |
|
INSTALLATION |
| |
|
|
|
| 2009 |
Metropolitan Water Works Authority. (MWA) |
|
|
| |
Owner : (MWA) |
MAIN MDB Vacuum Circuit Breaker(3.3/6.6KV) |
EE&INSTALLATION |
| |
Site Location : Bangkok (Samsen) |
MCC Stater Vaccum Contactor |
|
| |
|
|
|
| 2009 |
THAI MMA Co.,Ltd |
|
|
| |
Main contactor : Nalco Pacific Pte Co.,Ltd |
MCC 22KW.&PLC and PROGRAMING |
EE&AUTOMATION |
| |
Site Location : Rayong |
Plant Expansion Project |
INSTALLATION |
| |
|
|
|
| 2009 |
COGNIS THAI LTD. |
|
|
| |
Owner : COGNIS THAI LTD. |
Variable Frequency Drive Panel |
EE&INSTALLATION |
| |
Site Location : Bang pakong |
|
|
| |
|
|
|
| 2009 |
SFCC - SARABURI |
|
|
| |
Main Contactor : Nalco Industrial Sevice (Thailand) Co.,Ltd |
POLYMER FLUCCULANT FEED SYSTEM |
EE&AUTOMATION |
| |
Site Location : Saraburi |
|
INSTALLATION |
| |
|
|
|